Installed capacity: 2 x10.6MW
Year of commissioning: 2012
Engineer: Nippon Koei (Japan)
Turbine type: Vertical Francis
Generator manufacturer: Fujian Nandian (China)
Contractor: Sino Hydro (China)
Sang’oro is a cascade power station 4.7km from the Sondu Miriu power station. Water is conveyed from Sondu Miriu tailrace through a 4.7 km channel and a 133.6m length penstock from the head tank to the power station. Water from the station is released through a tailrace back to Sondu Miriu River. Power from the station is fed to the national grid through a 5km long 132kV transmission line to the Sondu Miriu sub-station.
Special Terms and Conditions
- Do not litter the compound. Segregate waste and put in the designated waste bins. green bins are for biodegradables and red bins are for non-biodegradable waste.
- Visitors are advised not to wear high heeled and open shoes.
- Do not lean on the guard rails.
- Do not run down the stairs.
- Do not touch panels, wires, switch buttons or any equipment.
- Kenya Electricity Generating Co. Ltd. accepts no liability for any accident or injury that might occur to any member of the visiting party during the tour.
- In case of any fire alarm, do not panic. follow the guide’s instructions. he will lead you to emergency assembly point.
- Smoking is strictly prohibited in the stations except in the designated smoking zones.
- Carrying and use of drugs and alcohol is strictly prohibited.
- Provide a list of names of members of your team to the guide and sign the provided form after the EHS awareness briefing.
- Photography is prohibited. Visitors will not be allowed tio use data storage devices, for example: flash drives or hard drives. Such devices must be deposited with the security guard at the entrance gate.
- Please note that while entering our premises ID cards are mandatory for all adults.
Available for booking on Tuesdays, Wednesdays and Thursdays only