Turkwel 2

Kipevu III Power Station, 120MW

Location
Commenced operation in 1999Located at Kipevu in Mombasa. .. View More

Turkwel 2

Kipevu I Diesel, 73.5 MW

Construction took place between 27th November 2009 between KenGen and Warstila of Finland. Facility handed over in 2011

Turkwel 2

Lamu 2.8MW,

The sets were installed at varied times as from 1999 with the latest having been commissioned in September 2007.

Turkwel 2

Garissa 6.2 MW (Temporary power Aggreko 3.4MW)

One of the sets was commissioned in May 2005 while the other units were commissioned in 1996.

Turkwel 2

Embakasi Gas Turbine 60MW,

The plant is in the process of being redeployed to Muhoroni in western Kenya.

 

Plants

ft Featured Video

ftAwards

Group 585
Group 586
Group 587
Group 581
 
 
 

ftOur Contacts

Head Office

  • KenGen Pension Plaza II
    Kolobot Road, Parklands
  • P. O. BOX 47936, 00100, Nairobi
  • TEL:
  • +254 711 036-000
  • +254 732 116-000
  • +254 020 366-6000
  • Email: pr@kengen.co.ke

© 2024 KenGen